NOAA Risk Management Examples
This page includes examples of assessments conducted on various NOAA work operations and tasks. There are two formats listed, Job Hazard Analysis and Risk Assessments. Both formats are appropriate and fall under the NOAA Risk Management program elements.
- Carpentry
- Changing fluorecent light bulbs and ballast
- Clam Preparation
- Copy Room
- Cruise equipment preparation
- Data Processing
- Equipment Repair
- Equipment setup and removal
- Equipment testing and repair
- Equpment maintenance
- Food Preparation
- HVAC filter changes
- Loading and unloading the ships
- Mounting and thin sectioning otoliths
- Network Management
- Otolith
Extraction
- Permount slide preparation
- Picking Fish Larvae
- Running Cable
- Salmon smolt data collection
- Scale Preparation
- Tank cleaning and maintenance
- Treatment of ill animals
- Scanning and Processing Ship Drawings
- Annual Boiler Maintenance
-
Engine Overhaul
- Electronic
Equipment Repair and Maintenance
- Shipyard Work Oversight
-
Engine Maintenance
- Bongo Net Deployment
-
CTD Deployment (8)
- Standing
Watch While Underway - OOD
- Cooking at Sea
-
Paint and Rust Removal
-
Launch Recovery
and Deployment
- Line Handling
- Oil Transfer
Page Last Updated:
October 18, 2007
|