ENVIRONMENTAL PROJECT PROSPECTUS
For
a "Printer Friendly" form, click here.
PROJECT # ______ DATE
________ Priority Ranking _____
(Completed by RECO)
Line Office/Facility Name _____________________________
Facility Contact/Phone ____________________
Installation Number ________________
Street Address and Geodetic
Location (if
known)
___________________________________________________
___________________________________________________
___________________________________________________
___________________________________________________
ASC/Contact/Phone ___________________________
Initial
Submission ________ Revision
______ (Check appropriate
choice)
Short Name of Project:
Simple phrase that differentiates this work from other work at the site.
___________________________________________________
___________________________________________________
Brief Description of Project:
1-4 sentences that capture the project and gives the reader an idea of where
this project starts and stops and whether or not subsequent follow on
work may be required
___________________________________________________
___________________________________________________
Estimated Cost of Project: (optional,
but desired if available)
Funding Citation or Phase Code if modification to existing project Previous
amount authorized and/or funded if applicable Total Project Cost Basis of cost
estimate--attach supporting documentation If not other cost estimate, breakdown
of costs can be shown here.
___________________________________________________
___________________________________________________
___________________________________________________
Description of Problem(s) Project
will Resolve:
Brief discussion of regulatory, compliance, or operational problems highlighting
degree of contamination or non-compliance. If this project is the result of
an audit finding, please list the finding number, date and the protocol area.
___________________________________________________
___________________________________________________
___________________________________________________
Impact of Not Performing Work:
Is the facility out of compliance now because of this problem? Will it be in
the future? (If so, when?) Is the problem growing in size, degree, or
cost? Will not performing the work impact the current or future use of
the building, land or water under consideration here?
___________________________________________________
___________________________________________________
___________________________________________________
Project Criticality:
Regulatory Requirement (example:
RCRA-Resource Conservation and Recovery Act; CAA-Clean Air Act; CWA-Clean
Water Act; NEPA-National Environmental Policy Act)
___________________________________________________
___________________________________________________
___________________________________________________
___________________________________________________
Currently being performed (If
yes, by whom?)
___________________________________________________
___________________________________________________
Should be performed in next
fiscal year (If
yes, why?)
___________________________________________________
___________________________________________________
Can be deferred, but should
be performed within next two fiscal years (If
so, when?)
___________________________________________________
___________________________________________________
Funding required by: (DATE)
_____________
Comments:
___________________________________________________
___________________________________________________
___________________________________________________
___________________________________________________
___________________________________________________
For
a "Printer Friendly" form, click here. |