NOAA Website
 
  ECHSSO Top Banner
 

 
 
Home -- Safety -- Environmental
 
 

OMB CIRCULAR NUMBER A-11 PREPARATION AND SUBMISSION OF BUDGET ESTIMATES

Executive Office of the President

Office of Management and Budget

Revised June 1996

12.4. Required consultations.

Certain proposals require coordination, as described below, before budget estimates are submitted to OMB.


(f) Compliance with pollution control standards. --Estimates of cost of control of environmental pollution, including the design, construction, management, operation, and maintenance of Federal facilities, will be submitted after consultation with the Environmental Protection Agency and in accord with Executive Order 12088, "Federal Compliance With Pollution Control Standards."


12.5 Estimates relating to specific objects of expenditure.


(d) Design and construction of Federal facilities. --Estimates for Federal facilities will be prepared, as described below.

(1) Pollution control standards compliance. -- Estimates of design and construction costs at Federal facilities will be in accord with Executive Order 12088, to be in compliance with pollution standards. [Note: Compare with EO 12088 section 1-4 language - "design, construction, management, operation, and maintenance ...."]


(t) Remedial environmental projects. --Estimates of cost of the design, construction, management, operation, and maintenance of remedial environmental projects at Federal facilities should be consistent with policies set forth in Executive Order 12088.